UBI / Project resources

Project resources

Project planning workbooks

Define room packages, compare the quotation basis and track approvals and delivery responsibilities with your project team.

Three shared XLSX workbooks. Labels are English and Chinese in the same cells; changing the page language does not translate the workbooks.

Confirm quantities, prices, dates, samples and China-side/local responsibilities for your project before freezing the agreed revision.

How to use the project workbooks

Use these guides alongside the three shared EN/ZH workbooks. Keep Project, Room type, Item and Revision IDs consistent across files; references link to the actual drawings, samples and signed records kept separately. The webpage explains the fields and does not translate the workbooks.

You can make a first enquiry with a short brief, drawings or reference photos. Incomplete information is welcome: identify what is known, leave unknown values blank, and agree the missing details together. A blank is not zero or approval.

Define rooms, quantities and responsibilities
Information to bring
Bring room types and counts, drawing revisions, item descriptions, units and quantities per room, with available material and hardware references.
Who confirms
The owner, operator or designer confirms counts and scope. Name the actual executing parties and one accountable decision-maker in RACI; each party confirms its own boundary.
Record to keep
Use Room types for authoritative counts, Room BOQ for items, RFQ scope for inclusions, exclusions and questions, and RACI for named roles, dates and dependencies. Retain the shared IDs and revision.
Next step
Resolve quantity and interface questions before freezing the RFQ revision. Keep unresolved items visible rather than treating them as included or priced.

Related workbook · XLSX · EN/ZHSheets to use: Room types · Room BOQ · RFQ scope · RACI

Agree the quotation basis and changes
Information to bring
Bring the selected BOQ/RFQ revision, drawing and material or sample baselines, quote IDs, proposed delivery place, and known freight and tax assumptions.
Who confirms
The quotation provider explains its offer; owner procurement or budget authority and the actual local logistics/tax parties confirm scope, commercial assumptions and payment-document references.
Record to keep
Link Quote lines to Quote basis. Record currency, included and excluded costs, delivery term and named place, validity and payment terms reference; use Alternatives, Budget and Changes for their distinct purposes.
Next step
Compare offers on the same agreed basis. Obtain the named approval, date and release/instruction reference before executing a selected change; a price difference alone is not approval.

Related workbook · XLSX · EN/ZHSheets to use: Quote basis · Quote lines · Alternatives · Budget · Changes

Confirm drawings and physical samples
Information to bring
Bring the current drawings, verified measurement/interface evidence, finish and hardware samples, sample or mock-up IDs, acceptance criteria and the physical sample location.
Who confirms
The designer, local measurer and appointed owner authority review drawings. The owner, designer or operator confirms appearance and function criteria, retained samples and any limitations.
Record to keep
In Drawings, retain document/revision, submission, review, approver/date and release instruction references. In Samples, retain sample ID, drawing/finish revision, custodian, outcome, rework and retained-sample reference.
Next step
Resolve comments and identify the approved revision and retained sample. Use an explicit project release instruction before the affected production or finish is released; submission is not approval.

Related workbook · XLSX · EN/ZHSheets to use: Drawings · Samples

Connect the agreed programme to dependencies
Information to bring
Bring the target opening or move-in date and dependencies for design, samples, materials, production, QC, shipping, customs and site installation.
Who confirms
The owner/project manager and the actual China-side and local delivery parties agree responsibilities, planned dates and the effect of unresolved dependencies.
Record to keep
Use Programme milestone IDs, responsible people, planned and actual dates, impact/action and confirmation records. Keep baseline revisions and forecasts in separate versioned references.
Next step
Review changes against the agreed plan, assign the next action and confirm affected dates. A target or forecast is not an actual completion or a standard delivery promise.

Related workbook · XLSX · EN/ZHSheets to use: Programme

Check local site readiness and installation interfaces
Information to bring
Bring verified site dimensions, substrate and building-services conditions, access and lifting limits, unloading/storage conditions, humidity and protection requirements, and installer interface information.
Who confirms
The local measurer, installer and owner/local project team confirm site conditions and local work. The China-side technical team confirms the product interfaces within its agreed scope.
Record to keep
Reference survey and installation interfaces in RFQ scope and Drawings, assign parties in RACI, and retain readiness/acceptance criteria in Handover with supporting site evidence.
Next step
Agree unloading, storage, protection, tools, installation resources and unresolved interfaces before the relevant shipment or installation stage. Local installation and support are included only when agreed.

Related workbook · XLSX · EN/ZHSheets to use: Drawings · Handover

Related workbook · XLSX · EN/ZHSheets to use: RFQ scope · RACI

Link packing, receipt, defects and after-sales actions
Information to bring
Bring package/carton and shipment IDs, room destinations, quantities, inspection/release records, and the agreed care, spare-parts and warranty-scope documents.
Who confirms
China-side packing/QC confirms packed contents. The local receiver checks quantities and condition; the owner, operator and local installer agree acceptance, open issues and the actual local support contacts.
Record to keep
Use Packing for carton-to-item/room links and receipt differences, QC-NCR for findings and corrective evidence, and Handover for documents, spares, exclusions, open actions, contacts and acceptance.
Next step
Record shortages, damage or defects with linked evidence, assign the next responsible contact and agree the remedy/action date. Keep open issues distinct from accepted items and confirm any replacement or spare-parts arrangement.

Related workbook · XLSX · EN/ZHSheets to use: QC-NCR · Packing · Handover

Six checks before comparing or approving a quote

Scope, revision and quantity
Tie the offer to the exact BOQ, drawing/material revision, quantity and unit. A total without this basis does not show whether the same work is being offered.
Currency and alternatives
Compare the same currency and an equivalent scope. Record specification, appearance, function, sample and programme differences for each alternative; do not add unlike currencies or treat a calculated delta as approved.
Delivery term and named place
Record the actual proposed delivery term, including any agreed Incoterms reference, and its precise named place or delivery point. Confirm the corresponding China-side and destination interfaces.
Included and excluded tax/freight costs
State which freight, tax, import/customs, unloading and installation costs are included, excluded or still assumptions, and link the basis. Unknown costs remain unknown rather than zero.
Validity and payment reference
Enter the actual quote validity date and the agreed payment-terms document reference. Do not invent payment percentages, credit terms or fixed periods where none have been agreed.
Approved change and execution instruction
Give each change its own ID, affected revision, amount/currency and programme impact. Keep the approving person, approval date and release/instruction reference; calculation or selection alone does not authorize execution.

How to read the records

“To provide”, “submitted”, “returned” and “approved” are examples for distinguishing project records, not a claim that each workbook has these four built-in allowed values. Use each sheet’s actual options and the status meanings agreed for the project, and record the confirming person, date and evidence. Neither this page nor a workbook formula approves scope, price or production.

Programme has Planned date and Actual date for milestones; Confirmed date records sign-off. It has no separate baseline-revision or forecast-date columns. Keep those in dated, versioned references and preserve earlier plans; never overwrite an agreed or actual date with a forecast.

Link each issue’s discovery date, photos, carton/item ID, description, responsible contact and next action to its evidence reference. Handover has no dedicated discovery-date or photo columns: keep that evidence separately and reference it through the document/spare/issue record.

Room product schedule

Use this blank worksheet to organize the products and open questions for each room before discussing your project.

XLSX · Separate English and Chinese sheets · 20 blank rows per sheet

Choose one sheet and enter one product per row. The sheets do not synchronize; quantities are entered manually.

What to record

  • Room IDs, spaces, products, quantities and units
  • Dimensions to confirm, substrate and finish directions, and hardware requirements
  • Reference image IDs and URLs
  • Supply and installation scope, sample approval status and responsible roles

This blank planning template is not a quotation or proof of manufacturing capability. Confirm specifications, samples and responsibilities for your project.