PROJECT ORGANIZATION & EXECUTION

Quality is resolved at each handover.

The quality plan follows the selected products, materials, intended use and destination requirements. Confirm the acceptance criteria and required documentation before production; certificates support a defined scope rather than replacing inspection.

  1. 01

    Supplier qualification

    Review the process fit and relevant experience.

  2. 02

    Factory verification

    Review the proposed production route and inspection arrangements.

  3. 03

    Material confirmation

    Record substrate, finish, grade and intended application.

  4. 04

    Sample approval

    Confirm appearance, feel, interfaces and agreed tolerances.

  5. 05

    First article

    Review the first produced item before batch replication.

  6. 06

    Production QC

    Follow checkpoints relevant to the product and process.

  7. 07

    Pre-shipment inspection

    Check quantity, finish, function and the agreed acceptance plan.

  8. 08

    Packaging inspection

    Review protection, labels and part separation.

  9. 09

    Loading check

    Record package condition and loading sequence.

  10. 10

    Delivery documentation

    Compile lists, inspection records and required product documents.

What this gives your project

Specify the product, issuing body, validity and test scope for any requested certificate. Project documentation is confirmed with the selected package.

START WITH YOUR PROJECT

A drawing. A material.
A place you have in mind.

Bring a rendering, CAD drawing, BOQ, sample or reference image. We can start from the information you have.

Start a project

Your project tray

Collect the directions you want to explore with your project team.

Start a project