← Back to library

Kitchen configurations

Powder coating and PVC fronts

The kitchen finish schedule combines powder-coated and PVC fronts in one named configuration. Exact shades, substrate construction and the assignment of each finish to individual doors remain project selection items.

The kitchen finish schedule combines powder-coated and PVC fronts in one named configuration. Exact shades, substrate construction and the assignment of each finish to individual doors remain project selection items. Compare this documented combination with the project layout and adjacent finishes. Confirm the construction and component interfaces before treating it as an order specification.

Configuration & project checks

Documented specification

Documented composition: powder coating and PVC. Substrate grade, thickness, exact finish match, hardware and component dimensions require separate confirmation.

Applications

Kitchen cabinetry and coordinated work, storage or dining zones; confirm the appliance and worktop interfaces.

Availability & edition

Catalogue reference; current materials, sizes, order availability and lead times require project confirmation.

Delivery & lifecycle

Agree sample approval, production and shipment milestones separately. Keep the approved sample; repair materials, repeat-order availability and replacement timing remain to be confirmed.

Reference status

Supply-network design reference, subject to review; it does not establish UBI design authorship or a project delivered by UBI.

START WITH YOUR PROJECT

A drawing. A material.
A place you have in mind.

Bring a rendering, CAD drawing, BOQ, sample or reference image. We can start from the information you have.

Start a project

Your project tray

Collect the directions you want to explore with your project team.

Start a project